Klinik Eichstätt
Location
Eichstätt, Bavaria, Germany
Project Phase
Phase 5 (Execution Planning)
Gross Floor Area (GFA / BGF)
The project comprised the new construction, conversion, and refurbishment of key medical areas within the hospital complex in Eichstätt, Bavaria. Services were provided in HOAI Phase LPH 5 (Execution Planning), with full responsibility for the preparation and coordination of detailed construction documentation.
The scope included the new construction and restructuring of the surgical department with three new operating theatres, the expansion of the emergency department, and the redesign of the central admission area. Particular emphasis was placed on integrating highly technical medical infrastructure, ensuring compliance with strict healthcare regulations, and coordinating multiple disciplines within a complex hospital environment.
Through precise detailing and structured coordination, the execution planning ensured constructability, cost control, and adherence to schedule, while maintaining the operational requirements of the clinic throughout the planning process.